Archive for October, 2009
The start of the wet season has begun in Seattle and heavy rain can increase the chance of landslides due to soil saturation, which reduces slope stability. Property owners of landslide-prone sites are advised to clear drains and take other simple measures, such as: checking downspouts, to make sure they are functioning and routed to a safe location; and inspecting sloping areas of their property for indications of slope movement (such as cracks in the ground, and newly tilting trees) and erosion.
[More]
Posted: October 30th, 2009 under Building Connections, Top News Stories.
During June and July, many neighbors joined in meetings and many other hundreds participated in on line questionnaires to review the Draft Neighborhood Status Reports and comment on changes— good, bad, and unexpected —that have occurred since Seattle’s Neighborhood Plans were written in the late 90's. ... The Neighborhood Plan Advisory Committee (NPAC) and the Seattle Planning Commission want to report back to you on the trends that emerged so far and to get your help to identify the continuing priorities and new issues that should be emphasized in the final Status Reports and a State of the Neighborhood Report that will be presented to the City Council and Mayor.
[More]
Posted: October 20th, 2009 under Building Connections, Long-Range Planning, Top News Stories.
Tags: neighborhood planning, neighborhoods, planning commission, public meeting, status reports
Public review drafts of the 2009 editions of the Seattle Building Code, Seattle Existing Building, Seattle Mechanical Code and Seattle Fuel Gas Code will be available in mid-October or early November.
[More]
Posted: October 6th, 2009 under Building Connections, Code Updates, dpdINFO Newsletter, Top News Stories.
Tags: building code, elevator code, fuel gas code, mechanical code
Over the last few months DPD staff has been working with neighborhood representatives to develop a proposal to rezone specific areas of industrial zoning within the Ballard Hub Urban Village (HUV) and outside the Ballard-Interbay Manufacturing and Industrial Center (BINMIC). The work stems from a Comprehensive Plan resolution adopted by Council in December 2007...
[More]
Posted: October 1st, 2009 under Building Connections, dpdINFO Newsletter, Long-Range Planning, Top News Stories.
Tags: ballard, comprehensive plan, industrial lands, rezone, urban village