Client Assistance Memos
NEW
- CAM 133, Installation of Electric Vehicle (EV) Charger for Commercial Properties, is designed to help guide you through the process of establishing an electrical vehicle (EV) charging infrastructure in commercial properties.
UPDATED
- CAM 303A, Common Seattle Residential Code Requirements, was updated to reflect new energy and residential code requirements, and to clarify the language of the egress section.
Director’s Rules
NEW
- DR 17-2011, Requirements for allowing grading in ECA between October 31st and April 1st (Grading Season Extension Application), contains the application and instructions for grading season extension requests. This rule will be effective in October 2011 and will replace DR 3-2002.
FINAL
- DPD DR 13-2010 and SPU DR 2010-005, Groundwater/Dewatering, interprets provisions of discharges into stormwater systems as described in SMC Section 22.805.020 Minimum Requirements for All Projects. This rule became effective September 28.