Tips
UPDATED
- Tip 304, Building Permit Requirements for Prefabricated Metal Buildings, to reflect the current code requirements.
- Tip 314, Seattle Building Code Requirements for Existing Buildings that Undergo Substantial Alterations, was updated with current energy code requirements.
- Tip 415, Applicant Responsibilities and Plan Requirements for Mechanical Permits, was updated with current code requirements.
Director’s Rules
DRAFT
- DR 5-2015, Alternate Design Requirements for Use of Special Reinforced Concrete Shear Walls in Over Height Buildings, establishes alternate design requirements for the use of Special Reinforced Concrete Shear Walls in buildings with a structural height between 240 feet and 265 feet. Send written comments by 5:00 p.m. April 3 to Steve Pfeiffer, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, WA 98124-4019.
- DPD DR 07-2015, SDOT DR 05-2015, University District Alley Activation Street Design Concept Plan, incorporates the University District Alley Activation Street Design Concept Plan into the Seattle Department of Transportation Right-of-Way improvements Manual. Send written comments by 5:00 p.m. April 10 to Director, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, Washington 98124-4019.
- DPD DR 08-2015, SDOT 01-2015, Occidental Avenue S and First Avenue S Street Design Concept Plan, incorporates the Occidental Avenue S and First Ave S Street Design Concept plan into the Seattle Department of Transportation Right-of-Way improvements Manual. Send written comments by 5:00 p.m. April 10 to Director, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, Washington 98124-4019.
- DPD DR 09-2015, SDOT 02-2015, Pontius Avenue N Street Design Concept Plan, incorporates the Pontius Avenue N Street Design Concept Plan into the Seattle Department of Transportation Right-of-Way improvements Manual. Send written comments by 5:00 p.m. April 10 to Director, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, Washington 98124-4019.
- DPD DR 10-2015, SDOT 03-2015, University Street, 8th Avenue, Terrace Street, Terry Avenue Street Design Concept Plan, incorporates the University Street, 8th Avenue, Terrace Street, Terry Avenue Street Design Concept Plan into the Seattle Department of Transportation Right-of-Way improvements Manual. Send written comments by 5:00 p.m. April 10 to Director, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, Washington 98124-4019.
- DPD DR 11-2015, SDOT 04-2015, Third Avenue Transit Corridor Street Design Concept Plan, incorporates the Third Avenue Transit Corridor Street Design Concept Plan into the Seattle Department of Transportation Right-of-Way improvements Manual. Send written comments by 5:00 p.m. April 10 to Director, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, Washington 98124-4019.
- DPD DR 13-2015, SDOT 06-2015, Brooklyn Ave NE, NE 43rd St and NE 42nd St Street Design Concept Plan, incorporates the Brooklyn Ave NE, NE 43rd St and NE 42nd St Street Design Concept Plan into the Seattle Department of Transportation Right-of-Way improvements Manual. Send written comments by 5:00 p.m. April 10 to Director, Department of Planning and Development, 700 5th Avenue, Suite 2000, P.O. Box 34019, Seattle, Washington 98124-4019.