Seattleās Department of Construction and Inspections (SDCI) is seeking volunteers to fill board openings for an electrical contractor, general contractor, commercial building owner or operator, and a developer and/or contractor on residential projects. Board members help the City evaluate construction codes to ensure that Seattle buildings stay safe, accessible, and sustainable. The deadline for submitting applications is March 11, 2019.
Construction and Demolition Material Management
Not all construction and demolition waste needs to end up in a landfill. In fact, much of that material can be recycled and even reused. With thoughtful consideration, developing a plan for how each material can be managed prior to the start of a project will help to ensure materials are handled in the most sustainable way. Therefore, new requirements for both the 2012 Seattle Building and Residential Codes ask that a Waste Diversion Plan is submitted with your application for all projects greater than 750 square feet. The plan should identify assumed waste materials, the hauler, and the receiving location for each material.
What Goes Up When the Red Wall on Capitol Hill Comes Down?
The draft Urban Design Framework for the light rail station sites on Capitol Hill describes a vision for the development of those properties once the light rail construction is complete.
Side Sewer Public Meeting — January 26, 2010
The Department of Planning and Development (DPD) and Seattle Public Utilities (SPU) staff will be hosting a meeting to discuss changes and clarifications regarding the Draft Side Sewer Code (Seattle Municipal Code 21.16) and Draft Joint DPD/SPU Directors Rule 7 2008/04-08, Requirements for Design and Construction of Side Sewers (Drainage and Wastewater Discharges).
